Greenside was appointed by main contractor, Mid Group Limited to deliver integrated services and building systems for a new school hall, teaching block and specialist teaching areas delivered in multiple phases on an operational, live school site in East London. Our £3m programme of works saw our serviced delivered over four phases to ensure continuity of teaching could be maintained and disruption minimised.

The Robert Clack Upper School project was successfully delivered on time, within budget and according to the main contractor’s exacting specification

The services we delivered included:

  • VRV heating and cooling
  • Plumbing
  • Lighting systems with daylight linked dimming
  • CHP (combined heat and power)

Lower School

Project:Robert Clack Lower School
Location:Dagenham, East London
Client:Mid Group Ltd
Date:2018

Greenside was appointed by main contractor, Mid Group Limited to deliver integrated services and building systems for a new teaching block at the Robert Clack Lower School in Dagenham, East London. The new 12-classroom block was designed to house the school’s Year 7 in a facility that would contain a number of ancillary teaching elements.

The project was successfully delivered on time, within budget and according to the main contractor’s exacting specification.

The services we delivered included:

  • VRV heating and cooling
  • Plumbing
  • Lighting systems with daylight linked dimming
  • CHP (combined heat and power)